Stormwater Training. CHECKLIST 6/10/14 FOR A CONSTRUCTION PERMIT The following is intended to assist in obtaining a construction permit. program which included desktop permit reviews and an on-site visit to the New Jersey Department of Environmental Protection (NJDEP) offices in Trenton, NJ on May 31 and June 1, 2016. The New Jersey PQR consisted of two components: permit reviews and special topic area reviews. This checklist is not all-inclusive as there are too many requirements to include all. NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION . 3. ... NJDEP – CAFRA, Wetlands, etc. MITIGATION PROJECT MONITORING REPORTS FOR TIDAL WETLAND . CHECKLIST FOR A CONSTRUCTION PERMIT The following is intended to assist in obtaining a construction permit. If you need assistance, please call the Bureau of Permit Mangement at 609-984-4428 and request assistance from the Administrative Review Unit. NJAC 7:27-8 This is simply a guide. For additional information, see state sections AIR EMISSIONS PERMITS and NEW SOURCE REVIEW. In many cases, a prior approval may have to be obtained before a construction permit can be issued. The preconstruction permit application form also serves as the application form for the operating certificate, and DEP issues the preconstruction permit and operating certificate simultaneously as one document. This page contains presentations, videos, and links to reference material that will aid in the implementation of a Stormwater Management Program and provide assistance in meeting conditions in the New Jersey Pollutant Discharge Elimination System (NJPDES) General Permit for Municipal Separate Storm Sewer Systems … The BMP Manual was developed by the New Jersey Department of Environmental Protection, in coordination with the New Jersey Department of Agriculture, the New Jersey Department of Community Affairs, the New Jersey Department of Transportation, municipal engineers, county engineers, consulting firms, contractors, and environmental organizations. In many cases, a prior approval may have to be obtained before a construction permit can be issued. Synthetic Minor Facilities. NJDEP/BWS&WP PERMITS Page 1 of 8 8/5/2011 INTRODUCTION The following is a guideline to help Developer’s file for a permit from the New Jersey Department of Environmental Protection (NJDEP) – Bureau of Water Systems and Well Permitting (BWS&WP) on a New Jersey American Water main extension. CHECKLIST FOR COMPLETENESS (8/00) All mitigation sites must be monitored starting the first full growing season after the construction/planting of NJDEP Freshwater Wetlands LOI Checklist 1.0 Introduction ... • The maximum fee for a CAFRA Individual permit, an Upland Waterfront Development permit, or an In-Water Waterfront Development permit is $30,000 per permit type. This checklist is not all-inclusive as there are too many requirements to include all. New Jersey Department of Environmental Protection. NJDEP Permit Readiness Checklist Form Page 3 of 13 . Please submit this Permit Readiness Checklist form, completed to the extent possible, electronically to Ruth.Foster@dep.state.nj.us and one (1) copy via mail with the following items if available: (a) The completed Permit Readiness Checklist (this form); 1) Project Checklist 2) GCUA's Application Form #CON-94 (original), signed by the local Municipality/MUA 3) Two (2) original signed and sealed (embossed) copies of NJDEP Treatment Works Approval Permit Application Form TWA-1 4) Two (2) copies of Notifications to Local Agencies by certified mail (return receipt requested) Checklists are available for each discharge category. ... NJDEP – CAFRA, Wetlands, etc.